|
|
| |
|
Operating Night: Friday, Febraury 27, 2004

A UP passenger train swings into Summit, passing under the newly-installed 4-track signal bridge

A huge CNW unit coal train is about to cross over itself westbound out of Summit

The power on this CNW coal drag pauses at the top of the hill to conduct a dynamic brake test

The recently-added freighthouse in Georgetown has undergone more revisions

Another view of the most recent version of the freighthouse

From left to right, operators Hiram, Jack, Bob, and Terry move trains around GC's mainline

A westbound New England Central freight makes a setoff at Georgetown

A unit ore train rumbles through Bridgeport

A long CNW unit coal train winds its way up the hill
|
|